Product image 1
Product image 2
Product image 3
HomeStore

Pacific Blue Reflective Long Lead - 30ft

Pacific Blue Reflective Long Lead - 30ft

Still working on your recall? Grab a 30 foot rope leash to give your dog room to roam, while still keeping him safe. Our long lead is also great to use as a tie-out while camping. (*But don't leave dogs unattended on a tie-out!) 

  • Length: 30 ft
  • Made with tightly spun, polypropylene/polyester ⁵⁄₁₆ in rope
  • Woven with reflective strands for use in low or no light conditions
  • Aluminum carabiner swivels and locks
    • Carabiner width: 1.5 in
    • Carabiner length: 2.5 in
    • Rated for 3 kN
  • Suitable for all dogs
$48.00
Pacific Blue Reflective Long Lead - 30ft
$48.00

Product Information

Shipping & Returns

Description

Still working on your recall? Grab a 30 foot rope leash to give your dog room to roam, while still keeping him safe. Our long lead is also great to use as a tie-out while camping. (*But don't leave dogs unattended on a tie-out!) 

  • Length: 30 ft
  • Made with tightly spun, polypropylene/polyester ⁵⁄₁₆ in rope
  • Woven with reflective strands for use in low or no light conditions
  • Aluminum carabiner swivels and locks
    • Carabiner width: 1.5 in
    • Carabiner length: 2.5 in
    • Rated for 3 kN
  • Suitable for all dogs